Walkthrough
Hi,
Had final walk through on Tuesday which went well. It was different to I thought, as it was not really a walk through and pick out the defects sort of thing. Apparently the building supervisor and one of the directors from the building company each do a walk through prior to handover to pick out defects.
There are still a few small details that need to be finished though before handover, including painting a window ledge that was never painted, some skirting boards in one spot, plus tidying up the plaster around some of the cabinetry.
The hot water system and over are installed the morning of handover (handover is not til 3pm).
I am talking just under 2 weeks off work for the move (I will leave early on Tuesday 27th Feb and not return til Tuesday 13th March).
When I get back to work I am doing system coordinator for 2 days a week, and my normal job for the remaining 3 days, as our systems coordinator is currently the acting manager, library services. It should provide me with some good experience, plus I am doing the roll out of a new print/copy credit management system to all the libraries.
If you need to contact me while I am on leave, just call me on my mobile (probably won't be checking my email that often for the first week or two, depending on when I get the Internet connected up). I will forward my new address and home phone to everyone soon.
Tomorrow Sean is going in to have all 4 wisdom teeth removed, so hopefully that will go well and he won't be sore for too long.
Anyway, better go.
Andrew
No comments:
Post a Comment